Al-Wafaa & Al-Amal Bridge is a vital traffic bridge constructed as part of the road development works along Suez Road, aiming to improve traffic flow and eliminate congestion points in East Cairo. The bridge plays a key role in enhancing connectivity and ensuring smooth vehicle movement in this high-traffic area.
Drilling and piling works for bridge foundations
Deep foundation execution
Supporting civil and structural works
Soilmec STM-30
The Soilmec STM-30 drilling rig was utilized to execute precise piling works for the bridge foundations, ensuring structural stability and compliance with engineering standards required for major bridge infrastructure projects.
Improves traffic efficiency on Suez Road
Reduces congestion at a critical intersection
Supports East Cairo’s road and bridge infrastructure development